Pump Systems

Private Systems

As experienced pump station technicians and manufacturers, Paradigm design engineers ensure they provide the most cost effective solution when designing systems to suit your project requirement. Our systems are built in accordance with BS EN 752-6: 1998 and section H of the Building Regulations. Systems to BS 8301 can be supplied upon request.

Adoptable Systems

Design

With a team of in-house consulting engineers, Paradigm Systems can offer our clients detailed design packages for Sewers for Adoption 6th and 7th Edition Pumping Stations for all water authorities. With over 40 years of experience, our design engineers are fully qualified to carry out the following steps to ensure the most cost effective pumping station for your application.

  • Detailed site surveys
  • Carrying out likely occupancy figures for developments
  • Agreeing flowrates with local Water Authority
  • Agreeing rising main routes
  • Preparing detailed drawings and documented calculations for S104 agreements with local Water Authority
  • Detailed costing proposals for supply and installation of the mechanical & electrical pumping station equipment

Installation

Following our detailed design service, Paradigm provides a complete contractor solution for Adoptable Pumping Stations to help you ensure the project is delivered on budget, on time. With our own Civils Contractor Framework, we take care of the excavations, chamber installations and the complete compound solution including fencing and lighting. Paradigm engineers will install the pumping system into the chambers and commission to the control panel prior to carrying out the Adoption Handover.
To ensure company Mission, Vision & Values are upheld, Paradigm always ensure that the relevant Water Authority is fully satisfied with the pumping station design and all the calculations to give you piece of mind and eliminate any delays to the adoption process.

 

P1230110