West Twyford Primary School, London

  • Client: Main Contractor
  • Number of Pumping Stations: 1
  • Project Location: Ealing, West London
  • System Type: Foul Pumping Station

In July 2015, Paradigm were awarded the pumping station design and manufacture contract for the new extension to the West Twyford Primary School project in London.

Due to the drainage layout, the project required a pumping station to hold a 24h storage capacity of approximately 25,000L of unscreened sewage.  Paradigm designed a pumping station with integral valves and mounted pump sump as the most efficient and sustainable solution to the issue.

About the School
West Twyford Primary School is located on Twyford Abbey Road in West London. The new facilities and increased capacity will mean that the school will be able to offer more to their existing 300 students and the wider community.