Red Bull Infiniti Racing, Milton Keynes

  • Client: Contractor
  • Number of Pumping Stations: 1
  • Project Location: Milton Keynes
  • System Type: Dual Pump Sewage System

During a project at Red Bull, Milton Keynes, a slight drainage issue meant the the toilets were no usable and all stops were pulled to create the best pumping solution in the smallest amount of time.

During October 2015, Paradigm were called on to supply a twin pump sewage station at very short notice.  Red Bull Racing head Quarters required a pumping station due to some drainage complications and the staff toilets were out of order.  Within 5 working days, the team at Paradigm designed, manufactured and delivered a complex pumping solution to fix the problem and get the facilities up and running again.

What did our client have to say?
“Dealing with Paradigm was quick and easy.  They spoke directly with the client and consultants to get an approved design as quick as possible and managed to manufacture and deliver it in a week.  Their service was second to none.”