Newquay Aerohub, Cornwall

  • Client: Main Contractor
  • Number of Pumping Stations: 1
  • Project Location: Newquay, Cornwall
  • System Type: 130,000 Litre Foul Pumping Station

During September 2015, Paradigm delivered a 130,000 litre foul pumping station to serve the new developments that are to be constructed at Newquay Aerohub in Cornwall.

The heavy duty GRP chamber was constructed with 100mm internal pipework to facilitate the 9 litre per second flow rate that had to be maintained through a mile long rising main.  Paradigm worked closely with Hyder Consulting designing the pumping station and supplied the unit to the groundwork contractor and assisted the installation to ensure the procedure went smoothly.