Horsham Gate 3 Development

  • Client: Main Contractor
  • Number of Pumping Stations: 1
  • Project Location: West Susex
  • System Type: Foul Pumping Station

Situated in the historic centre of Horsham, the Gate 3 project is a new high specification modern residential development designed to combine the historic market town with modern living

The project required a pumping station with an emergency storage capacity of over 18,000 litres.  Paradigm worked closely with contractors and consulting engineers to arrive at a packaged solution to reduce onsite costs and risks as well as achieve the 24h storage capacity required by building regulations.  The system was designed with dual solids handling capacity pumps with remote monitoring capability to aid early warning signals of a potential system failure.