Archives: Case Studies

Helping Clients Win Awards

  • Client: Contractor
  • Number of Pumping Stations: 1
  • Project Location: Birmingham
  • System Type: Specialist Foul Station

The new development of the Birmingham Institute of Forest Research (BIFoR) of the University of Birmingham was constructed with the aim of providing research with direct relevance to forested landscapes […]

Read more

Another Pumping Station Design Rescue

  • Client: Developer
  • Number of Pumping Stations: 1
  • Project Location: West Midlands
  • System Type: Type 3 Foul Pumping Station

There was no hope Severn Trent Water would consider adopting it.  It fell well short of Sewers for Adoption Guidelines and definitely their addendum. The multi-million pound housing development in […]

Read more

Garrard House, Reading

  • Client: Sub-Contractor
  • Number of Pumping Stations: 1
  • Project Location: Reading
  • System Type: Sewage Pumping Station

The development consisted of converting a commercial property into 83 contemporary apartments in the centre of Reading including a number of luxury basement apartments. Paradigm was contacted because a sewage […]

Read more

Pumping Mains and Steam Trains!

  • Client: Developer
  • Number of Pumping Stations: 1
  • Project Location: Alton, Hampshire
  • System Type: Thames Water Sewers for Adoption

Adoptable mains crossing private bridges can be a costly exercise if not executed correctly (especially over the historic and iconic Watercress Steam Railway Line). Since January 2017, Thames Water and […]

Read more

Horsham Gate 3 Development

  • Client: Main Contractor
  • Number of Pumping Stations: 1
  • Project Location: West Susex
  • System Type: Foul Pumping Station

Situated in the historic centre of Horsham, the Gate 3 project is a new high specification modern residential development designed to combine the historic market town with modern living The […]

Read more

Severe Flooding Issue Resolved in Berkshire

  • Client: Land Owner
  • Number of Pumping Stations: 1
  • Project Location: Reading
  • System Type: Surface Water Pumping Station

During June 2016, Paradigm engineers were called to attend a serious flooding issue at one of Reading’s busiest dual carriageways taking vehicles through the city centre to the central Rail […]

Read more

Manvers Street, Bath

  • Client: Main Contractor
  • Number of Pumping Stations: 1
  • Project Location: Bath
  • System Type: Foul Pumping Station

During January 2017, Paradigm were awarded a pumping station refurbishment project at an office redevelopment in Bath.  The system was designed to manage the foul water flows from the basement […]

Read more

The Grange Care Home, Surrey

  • Client: Main Contractor
  • Number of Pumping Stations: 1
  • Project Location: Surrey
  • System Type: Foul Pumping Station

In March 2017, Paradigm completed a bespoke foul water packaged pumping station for the new care home development. The 14,000 litre GRP station was installed with guiderail mounted twin heavy […]

Read more

University of Chichester – Temporary Pump Station

  • Client: Main Contractor
  • Number of Pumping Stations: 1
  • Project Location: Bognor Regis
  • System Type: Surface Water Pump Station

In February 2017, Paradigm completed a 120 l/sec temporary triple pumping station at the new University of Chichester Engineering and Technology Park. The multimillion-pound development at the Bognor Regis Campus […]

Read more

South West Trains – Clapham Junction

  • Client: Main Contractor
  • Number of Pumping Stations: 1
  • Project Location: London
  • System Type: Foul Pumping Station

In January 2017, Paradigm completed a foul water pumping stations at South West Train’s depot extension at Clapham Junction Station The project consisted of extending a sidings shed and installing […]

Read more